Project Implementation of Vb Railway Corridor

Project Implementation of Vb Railway Corridor
After successful completion of consulting services for the European Corridor Vc in December 2006 the Project Implementation of Corridor Vb was commissioned. The services contain in particular the overhaul of the 21,6 km long electrified railway line Vb section Skrad – Lokve on the transverse railway line between Zagreb – Rijeka of the European Corridor V. The project comprises moderni- zation and overhaul measures on existing tracks, railway crossings, railway stations, tunnels, bridges and culverts, signalling & tele- communication as well as power supply and overhead catenary to meet future operational require- ments.
Client:
HZ Croatiian Railways Ltd.
Zagreb, Croatia
Period:
2007 - 2009
Skrad-Lovke
Services:
  • Project management & cost control
  • Review of the detailed design and specifications
  • Participation during the PQ stages, tender evaluation and award process for contractors
  • Preparaton of tender documents
  • Contract implementation
  • Construction supervision
Technical data:
  • Modernization of the 21.646 km long railway section
  • Realignment and reconstruction of existing tracks, railway crossings and 3 railway stations
  • Rehabilitation of 5 tunnels (33m - 1,861m) as well as bridges & culverts, signalling & telecommunication
  • Adaptation of power supply (25 kV, 50 Hz) and overhaul overhead catenary
Department
Transportation
Spectrum
Rail Systems
Country
Croatia