Verkhnechonsk Associated Gas-fired Power Plant Construction Project

Verkhnechonsk Associated Gas-fired Power Plant Construction Project
Client:
OJSC TNK-BP Management
Period:
2009 - 2009
Services:
Stage I
  • Selection of suitable sites
  • Conceptual design
  • Technical solutions suitable to severe climatic conditions
  • Development of equipment transportation process map
  • Analysis of potential equipment and manufacturers

Stage II
  • Analysis of the base and backup Project implementation options
  • Project Investment Feasibility Study
Technical data:
  • Designed capacity:up to 600 MWe
  • Fuel:Associated gas
  • Location:Verkhnechonsk oil, gas and condensate field
OJSC TNK-BP Management planned to implement the Associated Gas-fired Power Plant Construction Project in Irkutsk Region (Siberia) to facilitate the efficient use of associated gas from its own Verkhnechonsk oil, gas and condensate field as a prerequisite of the Client’s extraction license liability.

Lahmeyer International Russland has been assigned to develop the conceptual design and pre-feasibility study for this project which will ensure reliable power supply to major sites and investment projects.
Department
Energy
Spectrum
Thermal Power Plants
Country
Russia