Athens Metro, Line 3 Extension, Pireos Forestation

Athens Metro, Line 3 Extension, Pireos Forestation
Attiko Metro is currently expanding the Metro Line 3 from the existing Station Egaleo towards the City of Pireos, with the terminal station located in he city centre. The approx. 450 m long forestation is located immediately behind the terminal station and includes a 220 m long TBM tunnel as well as a 200 m long triple-track NATM tunnel. Additionally, there are two shafts up to 35 m deep. Structures are located within densely built-up areas, with the tunnels passing under 7-storey buildings.
Client:
Attiko Metro S.A., Athens
Period:
2008 - 2008
City of Pireos
Services:
  • Geotechnical design and evaluation
  • Laboratory tests
  • Alignment
  • Structural design
  • Noise and vibration study
  • Modification of the Environmental Impact Study
  • E&M design
  • Tunnel ventilation simulation
Technical data:
  • Forestation= 0.44 km
  • TBM tunnel = 0.22 km
  • NATM tunnel (triple-track) = 0.2 km
  • 2 shafts
Department
Transportation
Spectrum
Urban Transport Systems
Country
Greece