Development of the Electricity Carbon Emission Factors for Russia and Ukraine

Development of the Electricity Carbon Emission Factors for Russia and Ukraine
Goal of this study is the calculation of reliable carbon emission factors for both Russia and the Ukraine for the period from 2009 to 2020. With these standard and broadly acceptable electricity carbon emission factors for the Russian and Ukrainian electricity systems, which serve as baseline scenario for the future development of Joint Implementation (JI), respective project activities are to be developed.
Auftraggeber:
European Bank for Reconstruction and Development
Ausführungszeitraum:
2009 - 2010
Leistungen:
  • In-depth data review and analysis under a long term perspective in order to reliably forecast Russia’s and Ukraine’s power systems
  • Development of a Power System Simulation Model in order to adequately display Russia’s several territorial electricity systems as well as the Ukrainian unified electricity system based on dispatch data analysis
  • Third party verification of the developed Power System Simulation Model and the corresponding Carbon Emission Factors for the purpose of official approval under the UNFCCC
Technische Daten:
Geschäftsbereich
Energie
Leistungsspektrum
Wirtschaft & Energieeffizienz
Emissionshandel
Energieplanung
Land
Russische Föderation